You are here:
  • Home
  • »
  • Products
  • »
  • 3 Road Bridge 172 Hilfiker Retaining Walls

3 Road Bridge 172 Hilfiker Retaining Walls

Steel machining - Customized shape and size →Click on

Ordinary Steel structure OEM&ODM →Click on

Pressure vessel/large tank processing →Click on

Other steel structure processing →Click on

  • Product Description

WO1984004768A1 - Prestressed component retaining wall

A retaining wall system utilizing a support structure (10) formed from standard concrete Tee forms (14,16). Figs.14 and 15 illustrate the manner in which the present invention may be utilized as a retaining wall in conjunction with a bridge abutment. Upper retaining flange 150 fits in notch 172 in column member 146 and is connected to WO1984004768A1 - Prestressed component retaining wall A retaining wall system utilizing a support structure (10) formed from standard concrete Tee forms (14,16). Figs.14 and 15 illustrate the manner in which the present invention may be utilized as a retaining wall in conjunction with a bridge abutment. Upper retaining flange 150 fits in notch 172 in column member 146 and is connected to USD445512S1 - Retaining wall block - Google PatentsUSD445512S1 US29/078,479 US7847997F USD445512S US D445512 S1 USD445512 S1 US D445512S1 US 7847997 F US7847997 F US 7847997F US D445512 S USD445512 S US D445512S Authority US United States Prior art keywords retaining wall wall block depicted shown embodiment Prior art date 1997-10-27 Legal status (The legal status is an assumption and is not a legal conclusion.

USD445512S1 - Retaining wall block - Google Patents

USD445512S1 US29/078,479 US7847997F USD445512S US D445512 S1 USD445512 S1 US D445512S1 US 7847997 F US7847997 F US 7847997F US D445512 S USD445512 S US D445512S Authority US United States Prior art keywords retaining wall wall block depicted shown embodiment Prior art date 1997-10-27 Legal status (The legal status is an assumption and is not a legal conclusion.US5451120A - Earth reinforcement and embankmentUS5451120A US07/806,331 US80633191A US5451120A US 5451120 A US5451120 A US 5451120A US 80633191 A US80633191 A US 80633191A US 5451120 A US5451120 A US 5451120A Authority US United States Prior art keywords meshes slabs salient earth slab Prior art date 1990-12-21 Legal status (The legal status is an assumption and is not a legal conclusion.US4572711A - Prestressed component retaining wall system A retaining wall system utilizing a support structure formed from standard concrete Tee forms.The structural members are assembled using post tensioning devices which impart added strength to the component members.Wall can be employed in a tier configuration,can utilize cross tie members,counterbalancing slabs and foot support devices to offset bending moment forces.

US4051570A - Road bridge construction with precast

The road bridge has now been completely assembled and the abutment enclosure is ready to receive a suitable fill material and road surfacing 106,as shown in FIGS.1 and 7. Adjustable cap for retaining walls US4266890A (en) * 1978-12-04 1981-05-12 Hilfiker Pipe Co Stringer for retaining wall construction US3981038A (en) * 1975-06-26 US3922864A - Stringer for retaining wall construction Known retaining walls require substantial cutting and fitting on the job and/or a plurality of different shaped parts which must be fit together in a precise way on the job (e.g.,see U.S.Pat.No.3,631,682). Hilfiker Pipe Co.Road bridge construction with precast concrete modules DE2716250A1 (en) * 1977-04-13 1978-10-19 US3922864A - Stringer for retaining wall construction Known retaining walls require substantial cutting and fitting on the job and/or a plurality of different shaped parts which must be fit together in a precise way on the job (e.g.,see U.S.Pat.No.3,631,682). Hilfiker Pipe Co.Road bridge construction with precast concrete modules DE2716250A1 (en) * 1977-04-13 1978-10-19

US3631682A - Reinforced concrete cribbing - Google Patents

Hilfiker Pipe Co Priority date (The priority date is an assumption and is not a legal conclusion.Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.) 1970-01-26 Filing date 1970-01-26 Publication date 1972-01-04 1970-01-26 Application filed by Hilfiker Pipe Co filed Critical Hilfiker Pipe CoThe Reinforced Earth Company - Experts in MSE Retaining WallsThe Reinforced Earth Company has built a reputation for engineering excellence,architectural creativity,and an unyielding focus on quality and customer support.We reduce uncertainty and improve the bottom line on projects for highways,waterfronts,industries,commercial and military projects in all 50 states.Standard design drawings WSDOT10.1-A6-3 Bridge Mounted Sign Bracket Details 1 of 3 (pdf 116 kb) (dwg 123 kb) 10.1-A6-4 Bridge Mounted Sign Bracket Details 2 of 3 (pdf 109 kb) 10.1-A6-4b Bridge Mounted Sign Bracket Details 2 of 3 10.1-A6-4c Bridge Mounted Sign Bracket Details 2 of 3

Road bridge construction with precast concrete modules

Oct 04,1977 3 Road Bridge 172 Hilfiker Retaining Walls#0183;What is claimed is 1.A road bridge including an abutment therefor formed of readily transportable precast construction modules,said bridge comprising a footing placed below road grade; generally vertical extending tie rods connected to said footing and extending upwardly therefrom,at least one of said rods being positioned adjacent each end of said footing; at least one abutment stretcher Retaining wall construction and method for construction of Oct 09,1990 3 Road Bridge 172 Hilfiker Retaining Walls#0183;This general construction has found much acceptance particularly in the road building industry wherein such constructions are used as retaining walls for embankments and as roadway supports.Other uses of this construction technique include coal and grain slots,sea walls,bridge abutments and the like.Retaining wall construction and method for construction of Oct 09,1990 3 Road Bridge 172 Hilfiker Retaining Walls#0183;This general construction has found much acceptance particularly in the road building industry wherein such constructions are used as retaining walls for embankments and as roadway supports.Other uses of this construction technique include coal and grain slots,sea walls,bridge abutments and the like.

Retaining and reinforcement system method and apparatus

Apr 13,1982 3 Road Bridge 172 Hilfiker Retaining Walls#0183;Fabric structures for earth retaining walls 1978-10-03 Hilfiker 4116010 Stabilized earth structures 1978-09-26 Vidal 405/268 4068482 Retaining wall structure using precast stretcher sections 1978-01-17 Hilfiker 4051570 Road bridge construction with precast concrete modules 1977-10-04 Hilfiker 3925994 System of armouring earth Retaining and reinforcement system method and apparatus Apr 13,1982 3 Road Bridge 172 Hilfiker Retaining Walls#0183;Fabric structures for earth retaining walls 1978-10-03 Hilfiker 4116010 Stabilized earth structures 1978-09-26 Vidal 405/268 4068482 Retaining wall structure using precast stretcher sections 1978-01-17 Hilfiker 4051570 Road bridge construction with precast concrete modules 1977-10-04 Hilfiker 3925994 System of armouring earth Retaining Walls and Chapter 730 Steep Reinforced SlopesRetaining walls are designed to limit the potential for snagging vehicles by removing protruding objects (such as bridge columns,light fixtures,or sign supports).Provide a traffic barrier shape at the base of a new retaining wall constructed 12 feet or less from the edge of the nearest traffic lane.The traffic barrier shape is optional

Related searches for 3 Road Bridge 172 Hilfiker Retaining

hilfiker retaining wallshilfiker wall systemshilfiker mse wallSome results are removed in response to a notice of local law requirement.For more information,please see here.Previous123456NextStandard design drawings WSDOT10.1-A6-3 Bridge Mounted Sign Bracket Details 1 of 3 (pdf 116 kb) (dwg 123 kb) 10.1-A6-4 Bridge Mounted Sign Bracket Details 2 of 3 (pdf 109 kb) 10.1-A6-4b Bridge Mounted Sign Bracket Details 2 of 3 10.1-A6-4c Bridge Mounted Sign Bracket Details 2 of 3Related searches for 3 Road Bridge 172 Hilfiker Retaininghilfiker retaining wallshilfiker wall systemshilfiker mse wallSome results are removed in response to a notice of local law requirement.For more information,please see here.12345NextUS4051570A - Road bridge construction with precast Precast concrete footings,stretchers,road slabs,and curbing in conveniently transportable sizes are used to construct road bridges and supporting abutments with a minimum of heavy equipment at the construction site.Each stretcher module comprises an elongated concrete body having at least two support heads with flat upper and lower surfaces for stacking one on another.Related searches for 3 Road Bridge 172 Hilfiker Retaininghilfiker retaining wallshilfiker wall systemshilfiker mse wallSome results are removed in response to a notice of local law requirement.For more information,please see here.

Projects List Hilfiker Retaining Walls

3 Road Bridge (172) Eatonville,WA.Center Street Bridge.Clearfiled,UT.Mercer Slough Environmental Education Center.Bellevue,WA.ERFO Road 1934 MP 2.1.Oakridge,OR.NER Phase 1 Final Paving,Landscaping.SeaTac,WA. Hilfiker Retaining Walls 1902 Hilfiker Lane PLAN VIEW - E WALL - hilfiker3 ROAD BRIDGE (172) MSE RETAINING WALLS PLAN VIEW GENERAL NOTES 12- 17-14 14-114 HW-141202CW 6.All information hereon is derived from the reference drawings,and is subject to geometric and geotechnical confirmation.The applicable Hilfiker construction guide and specifications are an integral part of this submittal.Reference Documents:Images of 3 Road Bridge 172 Hilfiker Retaining Walls imagesUnder 30' Hilfiker Retaining WallsThe 3 Road Bridge (172) project is a Welded Wire Wall Constructed in 2015.The two walls together are 4032 SF,a max height of 20',and located in Eatonville,Washington.The 3 Road Bridge (172) project was constructed by Mike McClung Construction,designed by Cesaretti Engineered Solutions,and owned by Hancock Forest Management.

Hilfiker Retaining Walls

Boasting over a century of experience,thousands of projects supplied world-wide,and extensive concrete and retaining wall product lines,Hilfiker has the competitive edge in the industry. Featured Project.3 Road Bridge (172) in Eatonville,WA.The 3 Road Bridge (172) project is a Welded Wire Wall Constructed in 2015.Learn More Experiences on early age cracking of wall-on-slab concrete This paper is an effect of coordinated efforts of Working Group 7 of RILEM TC 254-CMS Thermal cracking in massive concrete structures.The paper dealEarth Walls Cutting Edge Technologies The National EARTH WALLS ~ ~ q Roadway 175 \ Li~ ' ~ Backing Mat Behind 9 Ga.2 X 6,Typ.FIGURE 12 Schematic diagram of Hilfiker welded wire wall 3 Road Bridge 172 Hilfiker Retaining Wallsic d fit 11 Tensar Geogrid reinforcement - Geogrids cemented through brick faces to act as ties./N FIGURE 13 Tensar geogrids used to reinforce a brick retaining wall.

Drainage structures.- Free Online Library

Apr 15,1994 3 Road Bridge 172 Hilfiker Retaining Walls#0183;In general,locate subdrain pipe in side-road ditches or under shoulders to prevent water from reaching the roadway area; lay pipe on both sides of the pavement to control a high water table.In most cases,pipe should be not more than 6 ft below profile grade,in a trench filled with pervious filter material and capped with impervious material Detention Pond Makes Hospital Expansion PossibleAug 23,2013 3 Road Bridge 172 Hilfiker Retaining Walls#0183;Signature Stone has been manufacturing Redi-Rock,Concrete Fencing Stone Veneer Products for 10+ Years! Signature Stone offers a variety of manufactured stone veneer and precast products.Architectural stone veneer can be used to greatly enhance the look and feel of any project.Our products are crafted from natural stone in a process that makes the two hard to discern.DOT RGGB01 WASHINGTON STATE DEPARTMENT OFsunset way i/c retaining wall 16 03a048 thomco construction inc.wilder construction company pacific road bridge 13700 44th st ne 1525 e marine view dr 5802 cemetery rd 98223-7781 project lake stevens wa 982589714 everett wa 982011927 arlington wa 982233393

Crib block for retaining walls - The Clear Flow Co.,Inc.

Apr 25,1989 3 Road Bridge 172 Hilfiker Retaining Walls#0183;Road bridge construction with precast concrete modules October,1977 Hilfiker 4050254 Modular structures,retaining wall system,and method of construction September,1977 Meheen et al.3953979 Concrete wall blocks and a method of putting them together into a retaining wall May,1976 Kurose 3922864 Stringer for retaining wall CR17 Rockslide Update for Assessment MitigationJul 23,2019 3 Road Bridge 172 Hilfiker Retaining Walls#0183;the grout cures.At this point,the road will be safe for rock removal,work on the gas pipeline,Hilfiker retaining wall repair,and road repair/regrading. The contractor will be working with the County Road Bridge department to supply equipment and haul rock materials during the clean-up and wall repair.Earth Tech WestCHAPTER 3 ROAD DESIGNCHAPTER 3 ROAD DESIGN 3.1 Horizontal and Vertical Alignment .Center line alignment influences haul cost,construction cost,and environmental cost (e.g.,erosion,sedimentation).During the reconnaissance phase and pre-construction survey the preliminary

Bridge of the Week July 2011

Jul 31,2011 3 Road Bridge 172 Hilfiker Retaining Walls#0183;March 2011 (-43.509 Degrees,172.721 Degrees) Pages Road Bridge The next structure downstream is the Wainoni Bridge,but I never took a photo of it.The next bridge after that is Pages Road Bridge,a continuous three span haunched T-girder structure on pier walls that was built in 1951.Bridge Standards (English)MISCELLANEOUS RETAINING WALLS Rev Date Std Name Description File Name 03-10 RW(EM) Earthwork Measurement at Retaining Walls rwstde12.dgn 03-10 RW(BTR) Retaining Wall Traffic Rail at Base rwstds13.dgn 04-19 RW(LB) Lighting Bracket for MSE Retaining Wall TRF rwstde14-19.dgn 03-10 RW(RI) Roadway Inlet for MSE Retaining Wall TRF Apparatus and method for retaining wall top panel Feb 20,1996 3 Road Bridge 172 Hilfiker Retaining Walls#0183;Adjustable cap for retaining walls 1981-04-07 Hilfiker 405/284 4068482 Retaining wall structure using precast stretcher sections 1978-01-17 Hilfiker 61/47 4051570 Road bridge construction with precast concrete modules 1977-10-04 Hilfiker 14/26 3546720 RECTANGULAR SWIMMING POOL 1970-12-15 Hoch et al.417/219 2815656 Building

Adjustable cap for retaining walls - The Reinforced Earth

Apr 07,1981 3 Road Bridge 172 Hilfiker Retaining Walls#0183;Hilfiker 405/272 4051570 Road bridge construction with precast concrete modules 1977-10-04 Hilfiker 405/273 The present invention relates to retaining walls for earthen formations and,more particularly,is directed to a cap for such a wall to provide for selective adjustment of the elevation and inclination of the upper edge of the 3_road_bridge_141202cw_contractor_photo_hi.jpg Hilfiker Address Hilfiker Retaining Walls 1902 Hilfiker Lane Eureka,CA 95503-57113 Road Bridge (172) Hilfiker Retaining WallsThe 3 Road Bridge (172) project is a Welded Wire Wall Constructed in 2015.The two walls together are 4032 SF,a max height of 20',and located in Eatonville,Washington.The 3 Road Bridge (172) project was constructed by Mike McClung Construction,designed by Cesaretti Engineered Solutions,and owned by Hancock Forest Management.

Leave a Message

24 Hour steel Machining Response - Contact Now